1
/
of
7
Vesgantti
Vesgantti Twin Mattress, 12 Inch Memory Foam Hybrid Mattress in a Box with Individual Pocket Spring, Twin Size Mattress for Pressure Relief, Motion Isolation, Medium Firm Support
Vesgantti Twin Mattress, 12 Inch Memory Foam Hybrid Mattress in a Box with Individual Pocket Spring, Twin Size Mattress for Pressure Relief, Motion Isolation, Medium Firm Support
Regular price
$275.49 USD
Regular price
$275.49 USD
Sale price
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
About This
- 【Support and Comfort】- Vesgantti twin mattress combines premium memory foam with individually pocketed coils, which work together to provide targeted support and relieve pressure, so you awake feeling refreshed and free of aches and pains.
- 【Enjoy Healthy Sleep】- Our mattresses feature multi-layer breathable foam and 3D high-end knit fabric to maintain a cool and comfortable sleep environment all night. The non-toxic, hypoallergenic, baby-friendly design ensures the health and safety of the user.
- 【Motion Isolation Technology】- Hundreds of pocket springs work independently, not only minimizing motion transfer from your partner, but also effectively reducing the friction noise between the springs. Whether you are sleeping alone or with your partner, you can enjoy an uninterrupted sleep until you naturally wake up
- 【Optimal Medium Firmness】- Sleep preferences vary from person to person, so we recommend that you sleep on our medium firm mattress for a period of time to determine if the mattress is suitable for you. Just take your time, relax, and enjoy your sleep with Vesgantti
- 【Mattress-in-a-Box】- For your convenience, Vesgantti mattress is compressed rolled, and you can easily move it and set it up in your room. Our mattress is suited for foundation beds, bunk beds, guest beds and floor
Overview
- Brand : Vesgantti
- Size : Twin
- Product Dimensions : 75"L x 39"W x 12"Th
- Top Style : Euro Top
- Cover Material : Polyester Blend
- Number of Layers : 2
- Fill Material : Memory Foam
- Special Feature : Vacuums
- Color : White
- Coil Type : Pocketed Coil
- Item Firmness Description Medium Firm : Age Range (Description) Adult
- : Item Firmness Description Medium Firm
- : Age Range (Description) Adult
Share
